Xbar-s Control Charts: Part 1

September 2008

In This Issue

Greetings,

This month's newsletter is the first part of a two part series on Xbar-s charts. The Xbar-s chart is often overlooked in favor of the Xbar-R chart. But, the Xbar-s chart might actually be the better chart to use. This month we will introduce Xbar-s charts and describe how they are constructed. Next month we will look at a detailed example of an Xbar-s chart.

Best regards,

Bill

Introduction to Xbar-s Control Charts

The most common control chart for years has been the Xbar-R chart. This control chart uses the range to measure the variation within a subgroup. For the measurements within a subgroup, the range is the maximum - minimum value. The range is an easy concept to understand - and to calculate. This was important when the control chart calculations had to be done by hand or with a calculator. But with computer software, this is no longer an issue. One problem with the Xbar-R chart is that the range becomes a poorer and poorer measure of within-subgroup variation as the subgroup size increases. A different method is needed for the larger subgroup sizes. This is where the Xbar-s chart provides the solution. This month's newsletter introduces the Xbar-s chart.


This type of control chart is used with variables data - data that is taken along a continuum. Time, density, weight, and length are examples of variables data. Like most other variables control charts, it is actually two charts. One chart is for the subgroup averages (Xbar). The other chart is for the subgroup standard deviations (s).

Our software constructs and updates Xbar-s control charts. Click here for more information.

 

Understanding the Xbar-s Control Chart

In the past, there has been reluctance to use the Xbar-s chart in place of the Xbar-R chart. The standard deviation is just not as easy to understand as the range. Plus, there was the calculation issue.

Yet, the Xbar-s chart is very similar to the Xbar-R chart. The major difference is that the subgroup standard deviation is plotted when using the Xbar-s chart, while the subgroup range is plotted when using the Xbar-R chart. One advantage of using the standard deviation instead of the range is that the standard deviation takes into account all the data, not just the maximum and the minimum. The constants used to calculate the control limits and to estimate the process standard deviation are different for the Xbar-s chart than for the Xbar-R chart. As for the Xbar-R chart, frequent data and a method of rationally subgrouping the data are required to use the Xbar-s chart.

The figures below are an example of an Xbar-s chart. A company is tracking performance of a bagging machine. Each bag should contain a minimum of 50 pounds (lbs) of sand. Ten bags are weighed at the start of each hour. This provides frequent data as well as a method of rationally subgrouping the data. The ten bags are used to form a subgroup, so the subgroup size (n) is 10. The average weight of the ten bags is calculated. This is the subgroup average (Xbar). The standard deviation of the ten bags is calculated. This is the subgroup standard deviation (s).

The figure below is the Xbar chart. The Xbar values are plotted on this chart. Three lines are plotted on the chart. The middle line is the overall process average (Xbar); the upper line is the upper control limit; and the lower line is the lower control limit.

Xbar Chart

The figure below is the s chart. The subgroup standard deviations are plotted on this chart. Three lines are plotted on this chart as well. The middle line is the average standard deviation (sbar). The other two lines are the upper and lower control limits for the subgroup standard deviations.

s Chart


The bagging process represented by control charts above is in statistical control. Since the s chart is in statistical control, this means that the variation between the individual bag weights (the within-hour variation) is consistent over time. We don't know what the next s value will be, but we do know that it will be between 0.06 and 0.34 with a long term average of 0.2. Since the Xbar chart is in statistical control, the variation in subgroup averages (the hour-to-hour variation) is consistent over time. The next result will be between 50.1 and 50.49 with a long term average of 50.3. The process is consistent and predictable in the near future.

Our SPC for Excel software easily constructs and updates histograms, control charts and many other SPC tools. Click here for more information.

 

When to Use Xbar-s Control Charts

Xbar-s charts are used to analyze a process operating over time. Like all control charts, they will send a signal when a special cause of variation is present. You can use Xbar-s charts for any subgroup size greater than 1. This means they can be used in place of Xbar-R charts all the time. But, you definitely should use the Xbar-s charts when the subgroup size is 10 or more. The standard deviation gives a better estimate of the variation in large subgroups than the range does.

Data has to be frequently available (multiple samples per hour, day, or week). The subgroups should be formed with rational subgrouping in mind. In the bag weight example above, the subgroups were formed so that the Xbar chart examined the variation in the average bag weight for the subgroup from hour to hour while the s chart examined the variation within the subgroup from hour to hour. Selecting ten bags at the start of the hour helps minimize the variation in the s chart and causes the out of control situations to appear on the Xbar chart.

In situations where either the Xbar-s chart or the Xbar-R chart can be used (small subgroups), the choice is one of convenience more than anything. The control charts will generally look very much alike and you will reach the same conclusions.

Our customer complaint SPC package helps you easily monitor customer complaints.

 

The Steps in Constructing an Xbar-s Control Chart 

The steps in constructing the Xbar-s chart are given below. Most of the time you will use a software program to generate control charts. However, it is important to understand how the control charts are constructed and the steps in constructing them.

1. Gather the data.

Select the subgroup size (n). Typical subgroup sizes for an Xbar-s chart are 10 or more. However, you can use the Xbar-s chart with any size subgroup of two or more. The concept of rational subgroup should be considered. The objective is to minimize the amount of variation within a subgroup. This helps you "see" the variation in the averages chart easier.

Select the frequency with which the data will be collected. This will be part of the rational subgrouping. Time is always important in taking data and in interpreting the data. Data should be collected in the order in which they are generated (in most cases).

Select the number of subgroups (k) to be collected before control limits are calculated. You can start a control chart with only 5 subgroups. You will need to recalculate the averages and control limits for each new subgroup until you have at least twenty subgroups of data.

For each subgroup, record the individual sample results. For each subgroup, calculate the subgroup average (Xbar): where X1, X2, etc. are the individual sample results and n is the subgroup size:

Xbar Calculation Figure

For each subgroup, calculate the subgroup standard deviation:

 

Standard Deviation Calcuation Figure

2. Plot the data.

Select the scales for the x and y axes for both the Xbar and s charts

Plot the subgroup standard deviations (s) on the s chart and connect consecutive points with a straight line.

Plot the subgroup averages (Xbar) on the Xbar chart and connect consecutive points with a straight line.

3. Calculate the overall process averages and control limits.

Calculate the average standard deviation (sbar), where s1, s2, etc. are the standard deviations for subgroups 1, 2, etc. and k is the number of subgroups:

 

Average Standard Deviation Calculation Figure

Plot s on the sbar chart as a solid line and label.

Calculate the overall process average (Xdbar), where Xbar1, Xbar2, etc. are the subgroup averages for subgroups 1, 2, etc:

X double bar calculation figure

Plot Xdbar on the Xbar chart as a solid line and label.

Calculate the control limits for the s chart. The upper control limit is given by UCLs. The lower control limit is given by LCLs. B4 and B3 are control chart constants that depend on the subgroup size.

s Control Limits Figure

Plot the control limits on the chart as dashed lines and label.

Calculate the control limits for the Xbar chart. The upper control limit is given by UCLX. The lower control limit is given by LCLX. A3 is a control chart constant that depends on the subgroup size.

Xbar Control Limits Calculations Figure

Plot the control limits on the Xbar chart as dashed lines and label.

4. Interpret both charts for statistical control.

Always consider variation first. If the s chart is out of control, the control limits on the Xbar chart are not valid since you do not have a good estimate of sbar. All tests for statistical control apply to the Xbar chart. Points beyond the control limits, number of runs and length of runs apply to the s chart.

5. Calculate the process standard deviation, if appropriate.

If the s chart is in statistical control, the process standard deviation can be calculated as:

 

Standard Deviation Calculation Figure

c4 is a control chart constant that depends on subgroup size.

If the control charts indicate that the process is in statistical control, extend the control limits into the future and monitor the process performance using these control limits. If the control charts indicated that there are special causes of variation, find the reason for the special cause of variation and remove it from the process. Once you have 20 points in a row in statistical control, recalculate the control limits based on that data, and use those limits in the future.

Click here to view our past newsletters.

 

Xbar-s Control Chart Constants

Below are the control charts constants for the Xbar-s chart for subgroup sizes up to 25.

 

n A3 B3 B4 c4
2 2.659   3.267 0.7979
3 1.954   2.568 0.8862
4 1.628   2.266 0.9213
5 1.427   2.089 0.94
6 1.287 0.03 1.97 0.9515
7 1.182 0.118 1.882 0.9594
8 1.099 0.185 1.815 0.965
9 1.032 0.239 1.761 0.9693
10 0.975 0.284 1.716 0.9727
11 0.927 0.321 1.679 0.9754
12 0.886 0.354 1.646 0.9776
13 0.85 0.382 1.618 0.9794
14 0.817 0.406 1.594 0.981
15 0.789 0.428 1.572 0.9823
16 0.763 0.448 1.552 0.9835
17 0.739 0.466 1.534 0.9845
18 0.718 0.482 1.518 0.9854
19 0.698 0.497 1.503 0.9862
20 0.68 0.51 1.49 0.9869
21 0.663 0.523 1.477 0.9876
22 0.647 0.534 1.466 0.9882
23 0.633 0.545 1.455 0.9887
24 0.619 0.555 1.445 0.9892
25 0.606 0.565 1.435 0.9896

Next month, we will continue our look at the Xbar-s control chart.

 

 

Quick Links

Visit our home page

SPC for Excel Software

Online Videos of How the SPC for Excel Software Works

Measurement Systems Analysis (Gage R&R)

Software Customer Complaint SPC Software

SPC Training

SPC PowerPoint Training Modules You Can Customize

SPC Implementation

Special Offers

Ordering Information

Thanks so much for reading our newsletter. We hope you find it informative and useful. Happy charting and may the data always support your position.

Sincerely,


William McNeese
BPI Consulting, LLC